2, choose good day, ready to start<br> Before the workers enter the field, it is best to personally measure the corner of the home, take the pen ruler down, mark clearly. Clarify the area involved in the renovation process. In particular, brick area, wall paint area, wallpaper area, floor area; Especially in the future need to design the size of the wall furniture. Ground protection film<br> 3, the main body demolition, so that the space more practical<br> The main demolition is the first project, including the demolition of walls, wall building, shoveling wall skin, demolition of heating, plastic steel windows and so on. The waste that has been removed should be cleared out in time to ensure the cleanliness of the room, but also to facilitate construction. At this point, it is time to set the finished door down. At this time, it is best to put the cabinet, smoke machine, stove, water heater through, and try to determine down.<br> 4, hydropower transformation, arrange the use of each space<br> Hydropower transformation is the most important link, be sure to determine the switch, lamps, basins, bathtubs, washing machines and other exact location. Before the hydropower transformation, cabinet designers should go to the door to carry out the first measurement, help you determine a good power supply, waterway transformation program. Water heater, also best to send someone according to the model you determined, design a good power supply, up and down the water interface location. Reminder: The wall below the basin, it is best to leave a power outlet, convenient to install kitchen treasure. Air conditioning holes and power supply as far as possible on this wall at the end of the bed, to avoid the air conditioning directly to the people after blowing. Strong power and weakness to maintain a 20 cm gap, for example, between the socket and the network cable to leave a 20 cm distance.
正在翻译中..