If water needs are not met, according to the downstream water, the human dispatcher manually line scheduling correction map and a drain reservoir target.
If the water demand is not met, the schedule line and drainage target of the reservoir schedule map are artificially corrected according to the downstream water shortage.
If the water demand cannot be met, the operation line and drainage target of the reservoir operation chart shall be manually modified according to the water shortage situation in the downstream.<br>