1, first stop Kyaukpyu: accumulated 58%, C20 concrete retaining wall 820m3; <br>2, 950 + G75: Protection pipe Han: 6m³, C20 retaining wall: 30 m³;% accumulated total schedule 23 is <br>. 3, G100 + 500 : total truncated week pouring completed wall, 10m ³, a total accumulated progress% 60; <br>. 4, 900 + G100: steel pipe pile slope week total: 142m, steel pipe pile construction completed, a total of 54% of the overall schedule; <br>5 , G114 + 500: no progress this week, totaled% 21; <br>6, G116: steel pipe pile grouting 160; pouring concrete gutter 21.6m³, accumulated total progress% 60; <br>7, G123 + 000: test pit mining; accumulative the completion of the comprehensive progress% 70; " <br>" 1, G114: this week, a total of 43 steel pipe pile into the hole, steel pipe pile into the hole hole total of 301, total accumulated progress% 34; <br>2, G118: total steel pipe pile into this week bore hole 44, a total of 227 steel pipe pile into the hole-hole, 16m drains complete pouring accumulated 40m, accumulated% overall schedule 46 is;. <br>. 3, G147 + 000: borehole drilling approach trial, a total of 15% of the total progress ; <br>. 4, 230 + G147: to C20 pouring concrete wall erosion control is completed, C20 pool pouring concrete energy dissipation completed, drain cushion pouring is completed, the total accumulated% 29; <br>. 5, Gl 48 + 850: C20 retaining wall pouring 57m³, total 81m³, totaled 45% of the overall schedule. " <br>". 1, G132 + 300: Nl accumulated pile length 13.95 m excavation; N3 accumulated pile length 13.75 m excavation; N4 accumulated pile length 16.0 m excavation. N2 locking formwork; watering completed cushion locking the N7; N8 excavation of two meters, N10 locking pouring is completed, the accumulated%. 6 <br>2, G132 + 200 is: excavation drains, cleaning baffle between the old pile, total 1% of the overall progress of the completion of " <br>steel pipe pile Kong and Kong this week to 10, a total of 5%<br>"1, G424: transport approach stones accumulated about 55m3, sand about 37m3, gravel about 40m3; <br>C25 retaining wall foundation excavation 2, G529 + 40, on-site inspection has been carried out trough, template support and be pouring off station, tracking urge vibration; <br>. 3, 40 + G529 witness sample test block; <br>4, C25 stone backfilling concrete wall downstream of the gully, C25-site visits to check and supervise the concrete wall after spreading timely conservation mode; <br>5, Igawa required to accelerate personnel, qualifications, work at post-mortem examination of the material. " <br>gabion revetment engineering at the bottom of the gabion installation is complete, the shore is piling reinforcement. Central foundation excavation is completed, a total of gabion 40, 35 have been completed. Groins for construction on April 25.
正在翻译中..