1、皎漂首站:累计完成58%,挡土墙C20砼820m3; 2、G75+950:管道保护涵:6m³,C20护岸挡墙:30 m³;累计完成总进度的英语翻译

1、皎漂首站:累计完成58%,挡土墙C20砼820m3; 2、G75+

1、皎漂首站:累计完成58%,挡土墙C20砼820m3; 2、G75+950:管道保护涵:6m³,C20护岸挡墙:30 m³;累计完成总进度23%3、G100+500:本周共计截墙浇筑完成,10m³,累计完成总进度60%;4、G100+900:本周共计坡面钢管桩:142m,钢管桩施工全部完成,累计完成总进度54%;5、G114+500:本周无进度,累计完成21%;6、G116:钢管桩灌浆160;排水沟混凝土浇筑21.6m³,累计完成总进度60%;7、G123+000:探坑挖掘;累计完成综合进度70%;" "1、G114:本周共计钢管桩成孔43孔,钢管桩成孔总计301孔,累计完成总进度34%;2、G118:本周共计钢管桩成孔44孔,钢管桩成孔总计227孔,排水沟完成16m浇筑,累计40m.,累计完成总进度46%;3、G147+000:钻孔进场进行试钻,累计完成总进度15%;4、G147+230:C20砼防冲墙浇筑完成,C20砼消能池浇筑完成,排水沟垫层浇筑完成,累计完成总29%;5、G148+850:C20挡墙浇筑57m³,总计81m³,累计完成总进度45%。" "1、G132+300:N1累计完成开挖桩长13.95米;N3累计完成开挖桩长13.75米; N4累计完成开挖桩长16.0米。N2锁口支模;N7锁口垫层浇灌完毕;N8开挖2米,N10锁口浇筑完毕,累计完成6%2、G132+200:开挖排水沟、清理老桩桩间挡板,累计完成总进度1%" 钢管桩本周成孔10孔,累计完成5% "1、G424:转运进场石块累计约55m3、砂子约37m3、碎石约40m3;2、G529+40的c25档墙基础开挖,现场已进行验槽,对模板支护及浇筑进行旁站,跟踪督促振捣;3、G529+40现场见证取样试块;4、C25砼挡墙下游冲沟的石块回填工作,现场巡视检查并督促C25砼挡墙撒模后的及时养护工作;5、要求川庆加快对人员、资质、材料的报审报验工作。" 石笼护岸工程底部石笼安装完成,正在向岸边打桩加固。中部基础开挖完成,石笼共40个,已完成35个。丁坝于4月25日进行施工。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1, first stop Kyaukpyu: accumulated 58%, C20 concrete retaining wall 820m3; <br>2, 950 + G75: Protection pipe Han: 6m³, C20 retaining wall: 30 m³;% accumulated total schedule 23 is <br>. 3, G100 + 500 : total truncated week pouring completed wall, 10m ³, a total accumulated progress% 60; <br>. 4, 900 + G100: steel pipe pile slope week total: 142m, steel pipe pile construction completed, a total of 54% of the overall schedule; <br>5 , G114 + 500: no progress this week, totaled% 21; <br>6, G116: steel pipe pile grouting 160; pouring concrete gutter 21.6m³, accumulated total progress% 60; <br>7, G123 + 000: test pit mining; accumulative the completion of the comprehensive progress% 70; " <br>" 1, G114: this week, a total of 43 steel pipe pile into the hole, steel pipe pile into the hole hole total of 301, total accumulated progress% 34; <br>2, G118: total steel pipe pile into this week bore hole 44, a total of 227 steel pipe pile into the hole-hole, 16m drains complete pouring accumulated 40m, accumulated% overall schedule 46 is;. <br>. 3, G147 + 000: borehole drilling approach trial, a total of 15% of the total progress ; <br>. 4, 230 + G147: to C20 pouring concrete wall erosion control is completed, C20 pool pouring concrete energy dissipation completed, drain cushion pouring is completed, the total accumulated% 29; <br>. 5, Gl 48 + 850: C20 retaining wall pouring 57m³, total 81m³, totaled 45% of the overall schedule. " <br>". 1, G132 + 300: Nl accumulated pile length 13.95 m excavation; N3 accumulated pile length 13.75 m excavation; N4 accumulated pile length 16.0 m excavation. N2 locking formwork; watering completed cushion locking the N7; N8 excavation of two meters, N10 locking pouring is completed, the accumulated%. 6 <br>2, G132 + 200 is: excavation drains, cleaning baffle between the old pile, total 1% of the overall progress of the completion of " <br>steel pipe pile Kong and Kong this week to 10, a total of 5%<br>"1, G424: transport approach stones accumulated about 55m3, sand about 37m3, gravel about 40m3; <br>C25 retaining wall foundation excavation 2, G529 + 40, on-site inspection has been carried out trough, template support and be pouring off station, tracking urge vibration; <br>. 3, 40 + G529 witness sample test block; <br>4, C25 stone backfilling concrete wall downstream of the gully, C25-site visits to check and supervise the concrete wall after spreading timely conservation mode; <br>5, Igawa required to accelerate personnel, qualifications, work at post-mortem examination of the material. " <br>gabion revetment engineering at the bottom of the gabion installation is complete, the shore is piling reinforcement. Central foundation excavation is completed, a total of gabion 40, 35 have been completed. Groins for construction on April 25.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1, the first station: the cumulative completion of 58%, retaining wall C20 820m3;<br>2, G75-950: Pipeline protection culvert: 6m3, C20 shore retaining wall: 30 m3;<br>3, G100 plus 500: this week a total of wall-cutting pouring completed, 10m3, the cumulative completion of the total progress of 60%;<br>4, G100-900: This week's total slope steel pipe pile: 142m, steel pipe pile construction is completed, the cumulative completion of the total progress of 54%;<br>5, G114 and 500: No progress this week, the cumulative completion of 21%;<br>6, G116: steel pipe pile grout 160; <br>7, G123,000: pit excavation;<br>"1, G114: this week a total of 43 holes in the steel pipe pile pile, steel pipe pile into a total of 301 holes, the cumulative completion of the total progress of 34%;<br>2, G118: this week a total of 44 holes in steel pipe pile, steel pipe pile into a total of 227 holes, drainage ditch to complete 16m pouring, a cumulative 40m.<br>3, G147-000: drilling into the field for drilling, the cumulative completion of the total progress of 15%;<br>4, G147 and 230: C20 anti-flushing wall pouring completed, C20 anti-energy pool pouring completed, drainage trench mat pouring completed, the cumulative completion of a total of 29%; 5, G148 and 850: C20 retaining wall pouring 57m3, a total of 81m3, the cumulative completion of the total progress of 45%. <br>" "1, G132-300:N1 completed the excavation pile length of 13.95 meters; N3 completed the excavation pile length of 13.75 meters; N4 completed the excavation pile length of 16.0 meters.<br>N2 lock pattern; N7 lock pad layer watering finished, N8 excavation 2 meters, N10 lock gate pouring completed, complete6% of the total <br>2, G132 and 200: dig drainage ditches, clean up the old piles inter-stop bezel, the cumulative completion of the total progress of 1% " <br>Steel pipe pile this week into 10 holes, the cumulative completion of 5%<br>"1, G424: transfer into the stone accumulated about 55m3, sand about 37m3, gravel about 40m3;<br>2, G529 and 40 c25 bar foundation excavation, the site has been carried out a groove, the template support and pouring side station, tracking and urging vibration;<br>3, G529 and 40 site witness sampling test block;<br>4, C25 barrier wall downstream of the rock backfilling work, on-site inspection and supervision of C25 barrier wall after the timely maintenance work; 5, ask EdeQing to speed up the personnel, qualifications, materials of the examination and inspection work. <br>" The stone cage at the bottom of the stone cage protection project has been installed and is being piled and reinforced to the shore. The central foundation excavation was completed, with a total of 40 stone cages and 35 completed. Dingba was constructed on April 25.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. Kyaukpyu initial station: 58% has been completed in total, and C20 concrete of retaining wall is 820m3;<br>2. G75 + 950: pipeline protection culvert: 6m 3, C20 revetment retaining wall: 30 m 3; 23% of the total progress has been completed.<br>3. G100 + 500: the wall cutting pouring is completed in total this week, 10m 3, and the total progress is 60%.<br>4. G100 + 900: total steel pipe pile on slope this week: 142m, steel pipe pile construction has been completed, and the total progress has been 54%.<br>5. G114 + 500: there is no progress in this week, and 21% has been completed in total;<br>6. G116: steel pipe pile grouting 160; drainage ditch concrete pouring 21.6 m3, the total progress is 60%.<br>7. G123 + 000: exploratory pit excavation; 70% of the total progress has been completed;“<br>"1. G114: this week, there are 43 holes for steel pipe piles and 301 holes for steel pipe piles, with a total progress of 34%.<br>2. G118: in this week, there are 44 holes for steel pipe piles, 227 holes for steel pipe piles, 16m pouring for drainage ditch, 40m in total, 46% in total;<br>3. G147 + 000: drilling test is carried out at the site, and the total progress is 15%.<br>4. G147 + 230: the pouring of C20 concrete anti scour wall, C20 concrete energy dissipation pool and drainage ditch cushion has been completed, totaling 29%.<br>5. G148 + 850: the pouring of C20 retaining wall is 57m3, totaling 81m3, and the total progress is 45%. "<br>"1. G132 + 300: N1 has accumulated 13.95m of excavated pile length; N3 has accumulated 13.75m of excavated pile length; N4 has accumulated 16.0m of excavated pile length. N2 locking formwork; N7 locking cushion pouring completed; N8 excavation 2m, N10 locking pouring completed, accumulatively 6%<br>2. G132 + 200: excavate the drainage ditch, clean the baffle between the old piles, and complete 1% of the total progress.“<br>The steel pipe pile has 10 holes this week, 5% of which have been completed in total.<br>"1. G424: about 55m3 of stones, about 37m3 of sand and about 40m3 of gravel are transported to the site;<br>2. The C25 retaining wall foundation of g529 + 40 has been excavated, the groove has been inspected on site, the formwork support and pouring have been carried out on site, and the vibration has been tracked and supervised;<br>3. G529 + 40 field witness sampling test block;<br>4. The stone backfilling work of the gully downstream of C25 concrete retaining wall, site patrol inspection and supervision of the timely maintenance work of C25 concrete retaining wall after formwork spreading;<br>5. Ask Chuanqing to speed up the work of personnel, qualification and material application for examination and inspection. "<br>The installation of gabion at the bottom of gabion revetment project is completed, and pile driving is in progress to shore for reinforcement. The foundation excavation in the middle part has been completed, with 40 Gabions and 35 gabions. The spur dike was constructed on April 25.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: