At this time, it is best to put the cabinet, smoke machine, stove, water heater as soon as possible to determine down.<br> 4, hydropower transformation, arrange the use of each space<br> Hydropower transformation is the most important link, be sure to determine the switch, lamps, basins, bathtubs, washing machines and other exact location. Before the hydropower transformation, cabinet designers should go to the door to carry out the first measurement, help you determine a good power supply, waterway transformation program. Water heater, also best to send someone according to the model you determined, design a good power supply, up and down the water interface location. Reminder: The wall below the basin, it is best to leave a power outlet, convenient to install kitchen treasure. Air conditioning holes and power supply as far as possible on this wall at the end of the bed, to avoid the air conditioning directly to the people after blowing. Strong power and weakness to maintain a 20 cm gap, for example, between the socket and the network cable to leave a 20 cm distance.
正在翻译中..